At approximately 4:10 a.m., the CHI-1 facility experienced a utility 2 fault. Emergency generators are running.
It appears the medium-voltage ATS on utility 2 failed to transfer. The switch was manually cranked and closed, restoring power to the affected devices via generators. The site is presently in a stable condition. Several devices, including rack PDUs, were affected by the utility fault, and some servers are being manually powered on if they do not come up automatically after the outage.